Lubrication systems

Lubrication systems

The right lubricant quantity at the right time

SKF lubrication systems for industrial applications provide the appropriate lubrication quantity at the correct intervals, minimizing friction and wear and optimizing bearing and machinery service life.

Designed to lubricate individual machines or complete plants, SKF lubrication systems provide proper, precise lubricant replenishment to all required points, enabling a range of benefits in the process:

Significant savings in repair and spare costs

Increased machine reliability

Up to 50% savings in lubricant costs due to accurate timing and dosing of lubricants

Fewer shutdowns and production losses

Reduced environmental impact

Greater workers’ safety

SKF offers a comprehensive range for both oil and grease lubrication.

Lubrication systems

Lincoln - An SKF Group Company

Lincoln lubrication

Established in 1910, Lincoln is a world leader in the manufacture and sale of lubrication and pumping equipment for industry and vehicle service professionals. Lincoln is an SKF Group brand.

The power of lubrication – SKF and Lincoln